FAQs

Home » OEM & ODM » FAQs

What is the Minimum Order Quantity (MOQ)?

  • Household small rolls: Typically 1–2 tons.
  • Industrial large rolls: Typically 3–5 tons.
  • Special specifications: Depends on alloy and thickness.

About the Quality Management System.

  • ISO 9001 Quality Management System.
  • SGS Testing and Certification.
  • FDA Food Contact Material Standards.
  • EU Food Contact Regulations.

How long is the delivery cycle?

  • Production cycle: 15–25 days.
  • Customized products: 20–35 days.
  • Bulk orders: 30–45 days.

(Inventory products can be delivered quickly.)

What are the commonly used trade terms?

  • FOB (Free On Board).
  • CIF (Cost, Insurance and Freight).
  • CFR.
  • EXW.

What are the transportation methods?

  • Sea freight.
  • Air freight.
  • Rail freight.

We will help you choose the most efficient or most cost-effective shipping method based on your specific needs.

  • Full Container Load (FCL).
  • Less than Container Load (LCL)

Container type.

  • 20GP (suitable for heavy cargo).
  • 40GP.
  • 40HQ.

Sample Service.

Samples are free; the customer bears the cost of express delivery. We will send samples through the customer’s DHL/FedEx/UPS/TNT account.

How to ensure product safety during transportation?

  • Use moisture-proof packaging materials.
  • Use internal securing and reinforcement within the container.
  • Conduct a visual and quantity re-inspection before shipment.
  • We can provide container loading photos and reports.